Daily Archives: 11/01/2020

Moving on to the hstab front spar

This work was a bit challenging. We started with 2 front spars (HS-702s), and had to make a number of modifications to them in order to build the assembly. The spars are basically aluminum channels. The raised sides are called … Continue reading

Posted in Empennage | Leave a comment